Valley Center Water District
Search
Online Account Information / Login 
Sitemap
  • Home
  • Services
    • Water and Customer Service
    • Wastewater
    • Online Account Service
  • Board of Directors
    • Minutes and Agendas
  • News
    • 2009 Community Fire Safety Program
    • Wipes Clog Pipes
    • Water Fluoridation
  • Water Conservation
    • Water Saving Rebate Programs
  • Documents
    • Administrative Regulations
    • Annual Financial Reports
    • Budget
  • Projects
    • South Village Wastewater Expansion
    • Project Bid Opportunities
  • About Us
    • Departments
    • Fact Sheet
    • History
    • Links
    • Organization Values
    • Performance Measurement Standards
    • Privacy Statement
  • Jobs
  • Contact Us
Home  >  Services  >  Water and Customer Service  >  Having a New Water Meter Installed

Services

  • Water and Customer Service
    • How to sign up for water service
    • Having a New Water Meter Installed
    • Schedule of Rates
    • Agricultural Water Discount (IAWP & SAWR)
    • Paying Your Water Bill
      • Direct Payment Program
        • Authorization Agreement
    • No Water
    • Reporting Water Leaks
    • Reporting Suspicious Activities
    • Backflow Devices
      • Backflow Device Pictures
    • Backflow Freeze Protection
    • Is My Water Safe
    • Fluoride
    • Service Area
    • Reading Your Water Meter
    • Pumping Charges
    • How Your Water Bill Is Spent
    • District Regulations for Water Service
  • Wastewater
    • Reporting a Problem
    • Service Availability
    • South Village Water Reclamation Project
    • Having a Wastewater Connection Installed
    • Schedule of Rates
    • District Regulations for Wastewater Service
    • Sewer System Management Plan
  • Online Account Service

Having a New Water Meter Installed

Please see the Service Application Requirements below. 

 

Service Application Requirements

For an application to be accepted and processed, the documents listed below must be provided. Once the application has been accepted by the District, it will be added to the meter installation schedule and installed on a first-come, first-serve basis. Normal installation time is approximately 6 to 8 weeks.

  1. Property owner shall provide proof of ownership by a recorded grant deed or title report when a service is being resized or relocated, documents are to be recorded (OMRA, NHP, NLP, etc.) and/or proof of a private utility easement is required.
  2. Applicant shall provide a copy of the recorded parcel map, when applicable.
  3. Applicant shall provide evidence of a private utility easement if property does not adjoin the District’s right of way or an encroachment permit, if applicable.
  4. Applicant must pay all costs related to water and sewer service connection upon completion of application.
  5. All documents to be recorded which are a requirement of service must be signed, notarized and received by District prior to processing application.

Further guidance, information, and questions may be directed to Engineering Services by calling the District’s office at (760) 749-1600.

Copyright  2007-2012  Valley Center Municipal Water District 
  • Home
  • Services
  • Board of Directors
  • News
  • Water Conservation
  • Documents
  • Projects
  • About Us
  • Jobs
  • Contact Us